Day 162 February 21, 2002

The rough wiring is finally finished. I installed metal plates over the wires I hid in the loft joists to protect them from the nails that will soon be flying out of my nail gun into loft flooring.

I have an 11 AM appointment for a private electrician to inspect my design and wires. I ended up with 13 circuits, totaling around 1500 feet of cable. I spent the rest of the day cleaning up all the chips and sawdust from the drilling.

9 hours. Cloudy and still warm.

 

© 2001 - 2024 Basket Full Of Puppies LLC. All Rights Reserved.    This website hosted by the geniuses at Eagle Systems USA, Inc.