Day 259 September 19 , 2002

The floor arrived safe and sound.

It was well packaged and in a closed box truck so there was virtually no damaged pieces. The young driver (I must be getting old) helped me unload the 2500 ponds of Oak into the kitchen. It must acclimate here for a week or so before I can install it. Later, I laid all the tiles in the mud room that don't need cutting.

6 hours.

 