Day 130 December 17, 2001

I spent the first half of the day in bed, not feeling well. When I did finally feel better, I headed to Home Depot in Middletown to get the last of the supplies (until I get more money). I got the one piece tub enclosure, PVC pipe and various fittings. I drove home at 40 MPH because I didn't want the fiberglass tub to flex from the turbulence at my normal cruising speed. Once home I wrestled the tub inside. I needed it so I can put the rough plumbing in the right spot. Each fixture is slightly different. All the rough plumbing needs to be complete for the plumbing inspection. No fixtures are supposed to be hooked up, but I am going to hook up the sink and toilet temporarily so I can use them then remove them for the inspection.

8 hours, freezing rain all day.

 