Laurie had to leave early for a meet, I slept a while longer. The warmth of the wood stove is conducive to sleeping, one of the great things about cabin life. When I got up I worked on layout of the plumbing system. The design I have in mind has all units draining into one main stack then out to the septic system. The water distribution system will be designed to be drained easily from one convenient spot into the floor drain. Since the cabin won't have heat while I'm not here, the water has to be drained to avoid frozen pipes and the resulting mess.

12 hours, inside all day so it might have been cold. It was 70 inside.

 